Azerbaijan Railways presents updated data on Barda-Aghdam railway project

TheCyprus


Baku, Azerbaijan, April 7. Azerbaijan Railways
CJSC continues its work on the design and construction of the
Barda-Aghdam railway line, the CJSC told Trend.

The company reported that the length of the Barda-Aghdam railway
line along the axis is 47.1 kilometers, while the total length,
including side tracks, is around 58 kilometers.

“As part of the project, the construction of 130 engineering
structures, five stations (Barda, Kocharli, Tazakand, Garvend, and
Aghdam), and 34 railway crossings is planned.

Demining work has been completed on a section of the railway
line that is 60 meters wide. Construction of artificial engineering
structures for the project has been fully completed,” the CJSC
said.




The design and construction works of the Barda-Aghdam railway
line, except for the Aghdam station complex and Garvend station,
are 95 percent completed. The design of the Aghdam station complex
has been finished, while construction work is ongoing.

Stay up-to-date with more news on Trend News
Agency’s
WhatsApp channel

Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Total
0
Share